The implementation of the project is required due to emergency events on the railway track, and it involves its complete rehabilitation. The repair includes renewing the tracks and ties in a 5,358-meter section, restoring the adjacent structures, and drainage of the track. Upon completion of the construction works, the design speed of 100 km/h is restored, and the safety of travel is increased.