OBJECT:
Rehabilitation of the railway section "Tserkovski - Burgas" - Section 63 Vladimir Pavlov, Section 64 Vladimir Pavlov - Burgas, Section 65 Burgas Station
Client
“G.I. CHI EFFE – GENERALE COSTRUCCIONE FERROVIARIE" S.P.A. – BULGARIA BRANCH
Contractor:
“VECTOR CONSTRUCT“ LTD
Location:
Burgas

Description:

The implementation of the project is within the framework of the project for the rehabilitation of the Plovdiv – Burgas railway line, financed by the Cohesion Fund of the European Union under Axis 1 of the Operational Program “Transport”. Its implementation aims to improve and develop the national railway infrastructure and its integration with the transport network of the European Union. The railway has been rehabilitated to ensure a design speed of 120 km/h.

Details

Excavation and transportation to a landfill of old ballast and earth masses were carried out until the design elevations were reached;
The main ground platform has been reinforced and strengthened by rockfilling and laying a geomembrane;
Profiling and compaction of the main ground area, laying, profiling and compaction of a protective anti-freeze layer with a fraction of 0-32 mm and laying and profiling of a new ballast prism have been completed;
A drainage system has been built. Due to the lack of a facility for collecting domestic wastewater, a pusher has been built in Section No. 65 at Burgas Station;
New platforms have been built at Burgas Station and Vladimir Pavlov Station, meeting modern requirements for a generally accessible environment.