DRAINAGE DITCHES – KARNOBAT – BURGAS

OBJECT:
“Construction of drainage ditches along Track 1 and Track 2 in the sections Tserkovski – Karnobat, Chernograd – Aytos, Aytos – Bulgarovo, and Lozovo Station – Vladimir Pavlov Station on the 8th Main Railway Line Plovdiv – Burgas”
Client
“GCF – Generale Costruzioni Ferroviarie” S.p.A.
Contractor:
“VECTOR CONSTRUCT” Ltd.
Location:
Karnobat – Burgas

Description:

The project is part of the rehabilitation of the Plovdiv – Burgas railway line, funded by the Cohesion Fund of the European Union under Priority Axis 1 of the Operational Program “Transport.” The goal is to improve and develop the national railway infrastructure and integrate it into the EU transport network. The rehabilitated railway line enables train speeds of up to 120 km/h.

Details

In the Tserkovski – Karnobat section (km 218+909 to km 232+243 on Track 1 and Track 2), a total of 21,812 meters of drainage ditches were built, including 14,564 meters of reinforced concrete type EKT ditches and 7,248 meters of earthen ditches;
In the Chernograd – Aytos section (km 243+996 to km 258+247 on Track 1 and Track 2), a total of 23,231 meters of drainage ditches were constructed, comprising 15,876 meters of reinforced concrete type EKT ditches and 7,355 meters of earthen ditches;
In the Aytos – Bulgarovo section (km 259+420 to km 270+260 on Track 1 and Track 2), a total of 15,384 meters of drainage ditches were installed, including 6,244 meters of reinforced concrete type EKT ditches and 9,140 meters of earthen ditches;
In the Lozovo Station – Vladimir Pavlov Station section (km 281+575 to km 289+200 on Track 1 and Track 2), a total of 12,758 meters of drainage ditches were constructed, consisting of 4,388 meters of reinforced concrete type EKT ditches and 8,370 meters of earthen ditches.