SUBSTRUCTURE OF THE CERKOVSKI – KARNOBAT RAILWAY

OBJECT:
Construction of the railway structure in the Tserkovski – Karnobat section from km. 220+256 to km. 222+186
Client
“G.I. CHI EFFE – GENERALE COSTRUCCIONE FERROVIARIE" S.P.A. – BULGARIA BRANCH
Contractor:
“VECTOR CONSTRUCT“ LTD
Location:
village of Tserkovski – town of Karnobat

Description:

The implementation of the project is within the framework of the overall project for the rehabilitation of the Plovdiv – Burgas railway line, financed by the Cohesion Fund of the European Union under Axis 1 of the Operational Program “Transport”. Its implementation aims to improve and develop the railway infrastructure and its integration with the transport network of the European Union. The railway has been rehabilitated to ensure a design speed of 120 km/h.

Details

Excavation of earth masses has been completed until the design elevations are reached;
Profiling and compaction of the earth base site has been carried out;
Geotextile and geogrid have been laid to stabilize and strengthen the ground base;
A protective /anti-freeze/ layer with a fraction of 0-32 mm has been laid, profiled and compacted;
The implementation is the laying and profiling of a new ballast prism;
A new drainage system of drains and drainage ditches has been built.