REPAIR OF SVILENGRAD RAILWAY STATION

OBJECT:
"Repair works on the reception building in Svilengrad"
Client
“KALISTRATOV GROUP“ LTD
Contractor:
“VECTOR CONSTRUCT“ EOOD
Location:
town of Svilengrad

Description:

The project includes structural strengthening and complete architectural renovation of the reception building of the Svilengra railway station, so that it acquires the appearance of a modern and functional Schengen border station. The building was built in 1965 and before the renovation, most of it did not meet the current technical standards.
After the reconstruction, the building was brought into line with Bulgarian and European requirements for seismic resistance, energy efficiency and a generally accessible environment. The project was completed without interrupting the operational activities of the railway station and train traffic.

Details

Ten new foundations and metal washers were constructed, located in the eastern and western parts of the building, connecting to the old structure;
The building and its canopies are reinforced to withstand vertical seismic loads, according to the modern requirements of the ZUT;
The roof waterproofing and cladding of the building have been replaced;
The necessary energy efficiency parameters have been achieved;
The flooring and cladding have been replaced to improve the working environment and interior;
An accessible environment is provided for persons with reduced mobility;
The sanitary facilities have been reconstructed, conditions have been created for people in disadvantaged situations and mothers with children;
A new parking lot, vertical planning around the building, landscaping and recreational areas have been built.

similar projects