“GARITAGE PARK” COMPLEX, CITY OF SOFIA

OBJECT:
"Garitage Park Sofia“
Client
“GP GROUP“ JSK
Contractor:
“VECTOR CONSTRUCT“ LTD
Location:
Sofia, Malinova Dolina

Description:

“VECTOR CONSTRUCT” EOOD adds value in the construction of one of the largest residential and business complexes in Bulgaria – “Garitage Park”, located on an area of ​​167,000 m2. The project is being implemented in stages and when fully completed includes 95,000 m2 of offices, 60,000 m2 of housing, 90,000 m2 of parkland with a lake, children’s and sports grounds, a primary school for 500 children, 4,500 parking spaces, a sports center with a swimming pool, a sports hall with a capacity of 1,700 people, a medical center, a supermarket, restaurants, cafes and more.

Details

Construction of the structure of 10 row houses of group J 9 – 18, including:
- Formwork works – 2,483.45 m2;
- Reinforcement works – 58,656.30 kg.;
- Concrete works – 511.65 m3.
Architectural finishing works for the construction of a mixed-function administrative complex (Office Building 1), including:
- Construction of internal and external walls from Porotherm ceramic blocks with thicknesses of 120 and 250 mm;
- Construction of ceramic lintels and concrete belts;
- Construction of ventilation chimneys from double chimney bodies;
- Construction of communication openings on roofs from single-layer lattice bricks.
Construction of a substation, rough construction stage, including:
- Formwork works – 809.4 m2;
- Reinforcement works – 12,720 kg.;
- Concrete works – 1,858.1 m3.
Construction of a sprinkler and irrigation tank, including:
- Formwork construction – 1,431.42 m2;
- Installation of reinforcement – ​​50,513.00 kg;
- Concrete placement – ​​465,187 m3;
- Installation of water stop tape – 123.80 m.
Construction of retaining walls and fences on the north and west sides:
- Formwork construction – 2032.43 m2;
- Installation of reinforcement – ​​28,064.00 kg;
- Concrete pouring – 501.83.
Installation of gabions for forming terraces during the implementation of the vertical layout of the complex
- Installation of GABION CONTAINER with electro-welded mesh 76.2x76.2 mm, wire thickness 3.00 mm coating Zn+Alu) – 1163 pcs.