The project was carried out under an engineering contract (design and execution) to stabilize a landslide above the road serving the Chaira Reservoir. A reinforced concrete retaining wall was constructed, anchored in two rows both horizontally and vertically into the slope. The implementation of the project has secured the reservoir area’s infrastructure and ensured the safe operation of the facility.