CONSTRUCTION OF ARMONASIP SLAVYANOVO – POPOVO

OBJECT:
“Restoration of the drainage system in the section from km. 346+700 to km. 347+000 in the Slavyanovo - Popovo interstation on the 2nd railway line“
Client
“NATIONAL RAILWAY INFRASTRUCTURE“ COMPANY
Contractor:
“VECTOR CONSTRUCT“ EOOD
Location:
Intercity station Slavyanovo - Popovo

Description:

The implementation of the project was necessary after emergency events occurred on the railway as a result of landslides on the embankment slope due to prolonged rainfall and the appearance of groundwater. The strengthening was carried out by building a new reinforced embankment of geogrids and layers of compacted crushed stone fraction. Reinforcing ribs and horizontal drainages were built, monolithically cast reinforced concrete ditches were made. The existing culvert was extended.

Details

An embankment of gravel was filled between the individual profiles from the berm elevation to the bottom rib elevation in layers of 0.20 m each, compacted with a vibratory roller – 4,850 m3;
A geosynthetic mesh was delivered and laid to cover the slope of the reinforced embankment by the company Tenzar Mat – 4,100 m2;
Excavation activities, loading of earth masses and transport of 5 km were carried out for humus filling of the slope – 8,500 m3;
Spreading of earthen soils in layers of 15 cm and mechanized compaction with a pneumatic plate was carried out - 4,250 m3;
Horizontal drainages and drainage ditches have been completed – 1,350 m;
Construction work has been carried out to extend an existing culvert with reinforced concrete cassettes 150/150/100 cm;