The implementation of the project was necessary after emergency events occurred on the railway as a result of landslides on the embankment slope due to prolonged rainfall and the appearance of groundwater.
The strengthening was carried out by building a new reinforced embankment of geogrids and layers of compacted crushed stone fraction. Reinforcing ribs and horizontal drainages were built, monolithically cast reinforced concrete ditches were made. The existing culvert was extended.